The first park includes a capability of 200 MW while Sandrini II has a capacity of a hundred MW. The full cost of the two initiatives weren't disclosed nevertheless, all through development, around two hundred workers ended up employed. The assignments are anticipated to check out A few positions opening https://share.evernote.com/note/55803e9b-cf3b-f0fd-e472-e94245dad55c