Installation Overview At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely conclusion of the project. Designed to advance ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ emissions. https://myeasybookmarks.com/story6313490/advanced-400-kw-chiller-installation-delivers-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction